 looking for gas contractor ?

Project delays | In-completion of DOSH submission | Not comply to specification | Incompetent projects personnel | Improper report and documentation | Unjustified change order | Acceded budget | Management inquiries |

​
[ Don't take a risk. You deserved to be assisted by the COMPETENT ]
​​
"You were born with wings, why prefer to crawl through life?"

- Jalaluddin Rumi





​ONDAK OMPUN SDN BHD is the Competent Gas Contractor registered with the Department of Occupational Safety And Health (DOSH), PETRONAS, CIDB and Ministry of Finance (MOF).

​We are able to perform the Engineering, Procurement, Construction, Installation and Commissioning of the Natural Gas Metering Station, Gas Piping and onhore Natural Gas Pipeline Projects.


The OOSB's formula will provide the best solution for gas metering and gas pipelines. It will design reliable operation of gas facilities and offer the worth-full CAPEX of your business.

mastery in gas metering and piping

let's we assist you

  • Gas metering and gas piping installations.
  • Consultation on the project plannings and executions.
  • Project costing analysis.
  • Gas consumption analysis.
  • Project schedule development.
  • Pipe sizing and pipe stress analysis.
  • DOSH (JKKP) matters i.e. PTI/PTO.
  • Material selection for reliable operation.
  • Procedures and SOP for project and operations.
  • The competent Project  Team.
  • Safe execution and HSE Compliance.
  • Hot Tapping Works.
  • De-commissioning for tie-in works.
  • Pipe cleaning and testing.
  • Commissioning works.
  • Gas Test.
  • Diligent and timely reporting.
  • Final documentation and QC Report.
  • ... and many more!​

need more detail. feel free to contact us
click here

COST OPTIMIZATION.
DeLIVER ON TIME.
SAFELY INSTALLED. 

the masterpieceS!

CURRENT PROJECT.

Picture
Project Title:
End Cap the Service Line to Petronas NGV Station for Gas Malaysia Berhad  (38 Locations).
To abandon the 4" service line  for PNGV.

Client:
Gas Malaysia Berhad

JV Partner:
Globegas Engineering Sdn Bhd

Target Completion Date:
March 2020
Project Title:
EPCC of Gas Metering Station for 3nos of 3 Roaster at M Smelt (M) Sdn Bhd.
The installation  of gas metering system including the associated piping.

Client:

M Smelt (M) Sdn Bhd

Target Completion Date:
February 2020
Picture

PREVIOUS PROJECT.

GAS METERING.

Picture
Project Title:
EPCC of Gas Metering Station for Refineries at M Smelt (M) Sdn Bhd.
The installation gas metering system including the associated piping.

Client:

M Smelt (M) Sdn Bhd

Completion Date:
August 2019

Project Title:
EPCC of Gas Metering Station at IOI Pasir Gudang.
To develop the metering skid and regulation skid for the co-generation plant.

Client:

Sime Darby

JV Partner:
Globegas Engineering Sdn Bhd

Completion Date:
February 2019
Picture

GAS pipeline.

Picture
Project Title:
To Replace 10 nos of  Heavy Duty Valve Chamber Top Slab to Gred 50 concrete for GMB KL Branch.
Life line gas valve chamber works in Kuala Lumpur.

Client:
Gas Malaysia Berhad

JV Partner:
Globegas Engineering Sdn Bhd

Completion Date:
August 2019
Project Title:
To Upgrade Normal Type Valve Chamber to Heavy Duty Type at Jalan Mayang, Kuala Lumpur.
Life line gas valve chamber works in Kuala Lumpur.

Client:
Gas Malaysia Berhad

JV Partner:
Globegas Engineering Sdn Bhd

Completion Date:
November 2019
Picture
Picture
Project Title:
The Reinstatement of Gas Pipeline at Sentul West Station.
The relocation of 16" gas pipeline for MRT Projects.

Client:
MMC Gamuda JV

JV Partner:
Zumatex Engineering Sdn Bhd

Completion Date:
May 2019
Project Title:
The Relocation of  Existing Gas Pipeline at KLCC East Station.
The relocation of 8" gas pipeline for MRT Projects. Consisted 3 stages with 8 sets of Hot Tapping and Line Stopping.

Client:
MMC Gamuda JV

JV Partner:
Zumatex Engineering Sdn Bhd

Completion Date:
Dec 2018
Picture
Picture
Project Title:
The Installation of Nitrogen Pipe for Infineon Batu Berendam.
The new  nitrogen pipeline installation from Linde Plant to Infineon. Involved 7 crossing of HDD including  Malacca River.

Client:
Linde Malaysia

JV Partner:
Oceanergy Gases Sdn Bhd

Completion Date:
Sept 2018
Project Title:
The EPCC of NGDS FL DL Stage 2/17 at Tanjung Langsat Industrial Area.
8" gas pipeline works consisted Hot Tapping and HDD  and PETRONAS life line.

Client:
Gas Malaysia Berhad

JV Partner:
Zumatex Engineering Sdn Bhd

Completion Date:
Dec 2017